AES Group’s approach is focused on service, quality and professionalism. This allows us to address each project with the highest level of integrity, and ensures a successful outcome for our endeavors. AES Group’s design experience ranges in scale from small single-building building renovations to multi-million dollar contracts for the Federal Government.
Highlighted Projects
[Click on images to enlarge.]
DESIGN PIKES PEAK NATIONAL CEMETERY
Colorado Springs, CO | 2016 - 2023
AES provided the master plan, schematic design, and design development documents for a new National Cemetery. The master plan is for the entire site, approximately 375 acres, and full design for approximately 45 acres, or 125,000 grave sites and includes Master Plan 1 – Master Plan 5, Schematic Design 1 & 2, Design Development 1 & 2 and Construction Documents. This process included design review meetings and workshops, drawings, specifications, and Basis of Design reports. AES performed architecture, civil, structural, electrical, and mechanical engineering, life safety, communications, physical security design and LEED certification coordination. The site design included design of roadways, irrigation, landscaping, signage, all utilities and coordination with local municipalities for service. The project was LEED Silver Certified.
Building 6626 Corrosion Control Facility Renovation
Barksdale AFB, LA | 2020 - 2024/6
AES provided design for a corrosion control facility paint hangar and wash rack at Barksdale AFB. The project included 3-D point mapping of the existing hangar and surrounding site and conversion of the resulting mapping and photos to allow collaboration and understanding of existing conditions. This mapping was combined with both Revit 3-D and AutoCAD 2-D design development. The prior hangar was largely open air so a pre-engineered metal building within the existing hangar approach was taken to create the paint area with new walls and ceiling to reduce the modeled air flow. Computational Fluid Dynamics (CFD) of airflows was performed to support the design development. The project includes compliance with Federal High Performance Sustainable Building criteria, including third-party certification under the Guiding Principles system.
Prescott, AZ | 2019 - 2024
VA Prescott Renovate Historic Building 17
Provided design and construction administration service for the development and completion of update to Building 17. This includes upgrading current porch and building requirements to meet ABAAS accessibility standards. A wheelchair lift will be designed and installed within building. Upgrades will be made to current electrical and HVAC systems throughout the two story building. Consideration and care will be taken to preserve historic building aspects.
State of Colorado Construct Transient Unit Maintenance Shelter at Fort Carson
Fort Carson, CO | 2023 - 2024/5
This project constructs a Transient Maintenance Shelter, approx. 7,200 GSF. The shelter will be a shed type of structure, pre-engineered metal building, with 6-inch rigid concrete floor. A walled office and latrine, maximum area 400 SF (of the total space) will be constructed inside the shelter. The shelter will be enclosed on four sides and heated, due to geographical location.
NPS Canyonlands Solar Design Part II
Canyonlands NP, UT | 2023 - 2024
AES provided Architect/Engineer professional services for the Design Development (DD) and Construction Documents (CD) for the Canyonlands National Park Needles District Photovoltaic System. The design included multiple alternatives comparing photovoltaic sizing ranging from 80-160 kW of power. In addition to 120kW of solar PV in the vinal design, 1000 kWh of battery backup was included in the design to allow capture and use of the solar energy during evening hours. A new batter facility is also include in this design to house the PV controllers and power storage equipment. This facility is approximately 1800 SF and includes employee restroom and shower facilities. AES addressed all NPS considerations including an updated cost estimate.
NPS Mammoth Caves Design Rehab Hercules Shelter
Mammoth Cave, KY | 2022 - 2024
Provided Architect/Engineer professional services to renovate and upgrade the Hercules Shelter, which included, predesign, design development, construction drawings and cost estimates.
NPS Mammoth Caves Upgrade Campgrounds
Mammoth Cave, KY | 2022 - 2024
Provided electrical, mechanical, structural engineering services, cost estimating, pre-design, design development, construction documents, and site visits for the redesign of the campground facility. This project will complete four scenarios with three distinct Concept Plans.
VA Muskogee Renovate Restrooms
Muskogee, OK | 2022 - 2024
A/E services including site investigations, design and construction period services. A/E developed all demolition, architectural, structural, electrical, and fire protection drawings and specifications for these disciplines and provide detailed construction cost estimate and phasing plan.
VA Spokane Expand & Renovate Community Living Center
Spokane, WA | 2021-2025
Provided construction documents to expand the existing CLC by 9,900 SF and renovate approximately 20,000 SF of existing space. All will be designed and constructed to current CLC standards. Space planning shall meet VA SEPS guide The design of the CLC will be configured in such a way that it can easily be sectioned off and covered into a COVID unit. The HVAC for the entire building will be updated to meet the VA’s guidelines for COVID readiness, including the ability to convert to negative air pressure.
VA Anchorage Bldg 100 Cooling Study
Anchorage, AK | 2023 - 2024
AES provided Architect/Engineer services to include investigative services, site visits, calculations, preparation of cost estimates, and other services to evaluate and propose improvements to the existing cooling systems. The system is meant to provide cooling to 9 air handling units (AHU) and 16 IT air conditioning units at the AVAHS outpatient clinic located at 1201 N Muldoon Rd, Anchorage, AK, 99504. The focus will be on the cooling plant and the AHU coils/humidity condensation collection systems.
VA Durham, NC Expand
O/R Suite
Durham, NC | 2016-2024
AES provided space programming with conceptual plan options, design development, construction drawings, specifications and cost estimates through final design; and construction administration through construction completion. The project constructed a 3-story vertical addition, approximately 17,400 sf on top of an existing 2-story structure at the east end of the D-Wing of the main hospital. The addition connects to existing vertical and horizontal circulation, utilities and infrastructure at the floors below and at the 3rd, 4th and 5th floors of the adjacent 5-story structure.
VA San Juan CM Services for Phase 3 Seismic Correction and Renovation Bldg 1
San Juan, PR | 2016 - 2025
AES Construction Management Services provided by two full time on-site Structural Engineers, two full time Site Safety Representatives, one full time Architect, one full time Mechanical Engineer and one full time Construction Manager Scheduler to assist the Senior Resident Engineer (SRE) team in monitoring and inspecting the construction activities for compliance with contract requirements and industry standards.
VA Richmond Lab Expansion
Richmond, VA | 2016 - 2024
Provided construction documents and construction period services for the construction of 18,500 sf of new rooftop space for clinical lab and renovations of 3,500 sf for support and common space. Remodeled and reconfigured existing space and constructed new space to allow for an optimization of clinical service delivery, patient and family-caregiver privacy, collaboration between and among clinicians, educators and researchers, and efficiency of infrastructure.
VA 3 locations in NC Electrical Condition Assessments
Asheville, Salisbury & Fayetteville, NC | 2021 - 2022
AES has performed Electrical Condition Assessment studies of 3 VAMC’s. The purpose of these studies is to improve the safety and reliability of the electrical distribution system at the medical facilities. The scope of work for these projects included conducting electrical short circuit analysis, protective device coordination analysis, voltage drop analysis, arc flash hazard analysis, emergency power system analysis, and equipment condition assessments. Cost estimation for recommended changes is also included. The performed studies necessitate site surveys which include assessment and code compliance evaluation of the full electrical system.
Cherry Valley Event Venue
Franktown, CO | 2023 - 2024
AES provided design and specifications to remodel, expand and repurpose a large barn built at the turn of the century into a commercial wedding/event venue. This is a multi-disciplinary design incorporating architectural, mechanical, electrical, and structural engineering, as well as cost estimating.
Other Recent Projects
Please select a column to search in.
Please type in something to search for.
Type | Project Title | City | State | Year Completed | Project Description |
---|---|---|---|---|---|
USACE | Defense Logistic Agency Facility Condition Assessments | NC, PA, TX, UT | 2022 - 2023 | Conducted the architectural, electrical and mechanical engineering portions of the FCA and PPD of each real property, such as quality control plan, reviews and conferences, Draft Report Package, Draft PPD Package, Final Report Package, Final PPD Work Package, FCA photos, confirmation notices and status reports. | |
USACE | White Sands Missile Range B1407 | White Sands | NM | 2019 - 2023 | AES prepared 100% multi-discipline Design Documents for a $2.5 million CCL design-bid-build for 3,000 square foot special project tenant improvement. The renovation work included HAZMAT remediation, demolition, building renovations, site upgrades, and sustainable design. |
USACE | MUTE 4 and 6 Designs | Worldwide, OCONUS | 2021-22 | As a sub, AES provided structural engineering and design for the Multi-Use Tall Envelope building for the USACE Center of Standardization. One option had an eave height of approximately 4 meters. The building has 5 bays along with expandable end walls. The other option had a 6 meter eave height. | |
NAVFAC | Ford Island Bridge Repairs | Pearl Harbor-Hickam | HI | 2022 - 2024 | As a sub, AES conducted a detailed inspection of the existing conditions and deficiencies of the Ford Island Bridge, to provide an Engineering Report to address bridge and lighting deficiencies. We prepared a report to provide recommendations and estimated quantities for required cleaning, painting, repairs, replacement, and retrofits for deficient areas/members identified by the inspection. |
National Parks | NPS Camp Nelson Rehab Barracks | Nicholasville | KY | 2023 - 2024 | AES provided the preparation and completion of predesign, design development, construction documents and a site visit. Completed preliminary sizing calculations, prepared schematic drawings, and produced a three – five-page scoping report for all alternatives identified. This project included but is not limited to installing new cedar board (10") and batten (3") with a high-quality water repellant applied, as well as 10 new energy efficient windows to replace the failing windows currently installed. |
National Parks | NPS Mammoth Caves Rehab Frozen Niagra Shelter | Mammoth Cave | KY | 2023 | Provided Architect/Engineer professional services to renovate and upgrade the Frozen Niagara Shelter, which included, predesign, design development, construction drawings and cost estimates. Provided two concept designs for the shelter, which will accomadate seating capacity for up to 120 visitors. The existing shelter will be completely removed. |
National Parks | NPS Replace DDC Sub Control Modules at Acadian Sites | Jean Lafitte National Park & Preserve | LA | 2022 - 2023 | Provided Architect/Engineer services to replace the existing DDC sub control modules and thermostats within the Acadian Cultural Center, Wetlands Acadian Cultural Center, and Prairie Acadian Cultural Center buildings, which include predesign, design development and construction drawings. |
National Parks | NPS Jimmy Carter National Historic Park Addition | Plains | GA | 2021 - 2023 | AES designed new VIP (Visitors in Parks) RV Pads at the Jimmy Carter National Historical Park Boyhood Farm. Project will provide a master plan for the site and 4 RV pads with utility hookups similar to those found in commercial RV parks. |
National Parks | NPS Ft. Necessity FONE HVAC Title III | Farmington | PA | 2023 - 2024 | AES provided professional and consultation services to review primary construction contractors product submittals for compliance with project specifications and to answer any technical questions arising during the execution of the project. |
National Parks | NPS Replace HVAC Electrical at Edgar Allan Poe House | Philadelphia | PA | 2023 - 2024 | AES provided Architect/Engineer services, cost estimating, design development, construction documents, and site visits. The objective of this project is to replace failing HVAC and Electrical System, improve indoor air quality, and reduce required maintenance to maintain building equipment. The electrical and HVAC upgrade project increases outdoor air flow and address "Sick Building Syndrome" symptoms. |
National Parks | NPS OZARK Alley Spring Campground Upgrade | Eminence | MO | 2024 - 2025 | AES is providing multi-discipline design documents for the Integrated Park Improvement paln which will update campground layout, infrastructure, utilities, accessibility, concessions, flood resilience, comfort stations and natural resource protection. Project includes a charrette with stakeholders. |
National Parks | NPS Assateague Island National Seashore ASIS | Berlin | MD | 2021-22 | This project replaced all waterlines in the Maryland District of the park including approx. 10,065 LF of brittle, 2" flexible black plastic piping with steam mechanical fittings and clamps. Project also evaluated major water distribution system components to ensure system meets all requirements and included a pre-design analysis of the existing water distribution system so the waterlines are compatible with future use. Included considerations to extend a potable water supply line to a day use area to provide pressure needed for a fire suppression system and designing and routing the waterline corresponding to the Park's Flexible Design Strategy for Relocating Oceanside Campground Planning documentation. |
National Cemetery | Riverside National Cemetery Expansion | Riverside | CA | 2022 - 2023 | AES provided Structural, Mechanical/Plumbing, and Electrical/Telecom Engineering for this project for Master Planning and Development of a 35% design. Evaluate/expand electrical system, repurpose/renovate Adminisration Building, Honor Huard Facility, Education/Visitor Center. Modify/demolish and replace existing Committtal Shelter roofs. Construct Warehouse Facility, evaluate/design amphitheater for mainteneance and repairs. Construct satelltie public restrooms at West Gate entrance to cemetery. |
National Cemetery | Houston National Cemetery Construction Period Services | Houston | TX | 2021 - 2024 | As a sub, AES provided supervision and provided design services, construction period services and assistance during the construction solicitation phase. |
National Cemetery | Ft. McPherson National Cemetery Expansion | Maxwell | NE | 2021 - 2024 | As a sub, AES provided structural and electrical engineering for construction documents for development of 1500 in-ground cremains and a 150 marker memorial wall. The development will be constructed on a 17.8 acre parcel. |
National Cemetery | Natchez National Cemetery Burial Expansion | Natchez | MS | 2022 - 2023 | As a sub, AES provided electrical and structural engineering services for this gravesite expansion project, including furnishing all labor and materials to prepare design and construction drawings and specifications for all project elements and an estimate of construction cost. The intent is to construct a burial expansion consisting of 350 preplace crypt and 200 in-ground cremains burial plots including infrastrcture of utilities, signage, site furnishings, irrigation, exisiting road demolition, and a new committal service shelter to support the new development. |
National Cemetery | Baton Rouge National Cemetery Expansion | Baton Rouge | LA | 2021 - 2024 | As a sub, AES provided structural, electrical, and mechanical engineering services for demolition of a 1600 SF maintenance building/restroom and construction documents for a new 1600 SF maintenance building/restroom. This will include foundation, electrical, and HVAC/plumbing design and construction period services. |
National Cemetery | New Albany National Cemetery Expansion | New Albany | IN | 2022 - 2024 | As a sub, AES provided structural, mechanical/plumbing, and electrical engineering as the Designer of Record. AES provided structural engineering to support architecture for the maintenance/restroom building, columbarium, and rostrum work, mechanical/plumbing engineering for exhaust fans, ducts, and hot water supoly and mixing valve at eye wash and electrical engineering for smoke detectors, exterior security cameras, circuit breakers, and risk analysis for lightning protection. Includes construction period services. |
National Cemetery | Fort Lyon National Cemetery Upgrades | Las Animas | CO | 2021 - 2022 | As a sub, AES provided structural, electrical, and mechanical engineering services for demolition of a 1600 SF maintenance building/restroom and construction documents for a new 1600 SF maintenance building/restroom. This includes foundation, electrical, and HVAC/plumbing design. |
National Cemetery | Tallahassee National Cemetery MEP | Tallahassee | FL | 2022 - 2024 | As a sub, AES provided structural and electrical engineering for construction documents for development of 1600 pre-placed crypts (PC), and 2900 pre-placed concrete urn vaults (PV). Includes construction period services to expand the number of gravesites. |
National Cemetery | Albuquerque National Cemetery Phase 1 | Albuquerque | NM | 2023 - 2024 | As a sub, AES provided Mechanical, Electrical, Fire Protection and Security services to prepare for the design and contruction (design-bid-build) of Phase 1 of the New VA National Cemetery. This project provides for the Phase 1 Development at this new site by constructing 15 years of burial capacity. In addition, this expansion will incorporate 21st century design technology for efficiency and conservation. of natural resources. |
- 1
- 2
Total Records Found: 51, showing 30 per page
- 1