AES Group’s approach is focused on service, quality and professionalism. This allows us to address each project with the highest level of integrity, and ensures a successful outcome for our endeavors. AES Group’s design experience ranges in scale from small single-building building renovations to multi-million dollar contracts for the Federal Government.

NPS HVAC and Controls Replacement, Independence National Historic Park, Philadelphia

Highlighted Projects

[Click on images to enlarge.]

Pikes Peak Cemetery Overview
Pikes Peak Cemetery, Colorado Springs

DESIGN PIKES PEAK NATIONAL CEMETERY​

Colorado Springs, CO | 2016 - 2023

AES provided the master plan, schematic design, and design development documents for a new National Cemetery. The master plan is for the entire site, approximately 375 acres, and full design for approximately 45 acres, or 125,000 grave sites and includes Master Plan 1 – Master Plan 5, Schematic Design 1 & 2, Design Development 1 & 2 and Construction Documents. This process included design review meetings and workshops, drawings, specifications, and Basis of Design reports. AES performed architecture, civil, structural, electrical, and mechanical engineering, life safety, communications, physical security design and LEED certification coordination. The site design included design of roadways, irrigation, landscaping, signage, all utilities and coordination with local municipalities for service. The project was LEED Silver Certified.

Building 6626 Corrosion Control Facility Renovation

Barksdale AFB, LA | 2020 - 2024/6

AES provided design for a corrosion control facility paint hangar and wash rack at Barksdale AFB. The project included 3-D point mapping of the existing hangar and surrounding site and conversion of the resulting mapping and photos to allow collaboration and understanding of existing conditions. This mapping was combined with both Revit 3-D and AutoCAD 2-D design development. The prior hangar was largely open air so a pre-engineered metal building within the existing hangar approach was taken to create the paint area with new walls and ceiling to reduce the modeled air flow. Computational Fluid Dynamics (CFD) of airflows was performed to support the design development. The project includes compliance with Federal High Performance Sustainable Building criteria, including third-party certification under the Guiding Principles system. 

Prescott, AZ | 2019 - 2024

VA Prescott Renovate Historic Building 17

Provided design and construction administration service for the development and completion of update to Building 17. This includes upgrading current porch and building requirements to meet ABAAS accessibility standards. A wheelchair lift will be designed and installed within building. Upgrades will be made to current electrical and HVAC systems throughout the two story building. Consideration and care will be taken to preserve historic building aspects.

State of Colorado Construct Transient Unit Maintenance Shelter at Fort Carson

Fort Carson, CO | 2023 - 2024/5

This project constructs a Transient Maintenance Shelter, approx. 7,200 GSF. The shelter will be a shed type of structure, pre-engineered metal building, with 6-inch rigid concrete floor. A walled office and latrine, maximum area 400 SF (of the total space) will be constructed inside the shelter. The shelter will be enclosed on four sides and heated, due to geographical location.

NPS Canyonlands Solar Design Part II

Canyonlands NP, UT | 2023 - 2024

AES provided Architect/Engineer professional services for the Design Development (DD) and Construction Documents (CD) for the Canyonlands National Park Needles District Photovoltaic System.   The design included multiple alternatives comparing photovoltaic sizing ranging from 80-160 kW of power.  In addition to 120kW of solar PV in the vinal design, 1000 kWh of battery backup was included in the design to allow capture and use of the solar energy during evening hours.  A new batter facility is also include in this design to house the PV controllers and power storage equipment.  This facility is approximately 1800 SF and includes employee restroom and shower facilities.  AES addressed all NPS considerations including an updated cost estimate.

NPS Mammoth Caves Design Rehab Hercules Shelter

Mammoth Cave, KY | 2022 - 2024

Provided Architect/Engineer professional services to renovate and upgrade the Hercules Shelter, which included, predesign, design development, construction drawings and cost estimates.

NPS Mammoth Caves Upgrade Campgrounds

Mammoth Cave, KY | 2022 - 2024

Provided electrical, mechanical, structural engineering services, cost estimating, pre-design, design development, construction documents, and site visits for the redesign of the campground facility. This project will complete four scenarios with three distinct Concept Plans.

VA Muskogee Renovate Restrooms

Muskogee, OK | 2022 - 2024

A/E services including site investigations, design and construction period services. A/E developed all demolition, architectural, structural, electrical, and fire protection drawings and specifications for these disciplines and provide detailed construction cost estimate and phasing plan.

VA Spokane Expand & Renovate Community Living Center

Spokane, WA | 2021-2025

Provided construction documents to expand the existing CLC by 9,900 SF and renovate approximately 20,000 SF of existing space. All will be designed and constructed to current CLC standards. Space planning shall meet VA SEPS guide The design of the CLC will be configured in such a way that it can easily be sectioned off and covered into a COVID unit. The HVAC for the entire building will be updated to meet the VA’s guidelines for COVID readiness, including the ability to convert to negative air pressure.

VA Anchorage Bldg 100 Cooling Study

Anchorage, AK | 2023 - 2024

AES provided Architect/Engineer services to include investigative services, site visits, calculations, preparation of cost estimates, and other services to evaluate and propose improvements to the existing cooling systems. The system is meant to provide cooling to 9 air handling units (AHU) and 16 IT air conditioning units at the AVAHS outpatient clinic located at 1201 N Muldoon Rd, Anchorage, AK, 99504. The focus will be on the cooling plant and the AHU coils/humidity condensation collection systems.

VA Durham, NC Expand
O/R Suite

Durham, NC | 2016-2024

AES provided space programming with conceptual plan options, design development, construction drawings, specifications and cost estimates through final design; and construction administration through construction completion. The project constructed a 3-story vertical addition, approximately 17,400 sf on top of an existing 2-story structure at the east end of the D-Wing of the main hospital. The addition connects to existing vertical and horizontal circulation, utilities and infrastructure at the floors below and at the 3rd, 4th and 5th floors of the adjacent 5-story structure.

VA San Juan CM Services for Phase 3 Seismic Correction and Renovation Bldg 1

San Juan, PR | 2016 - 2025

AES Construction Management Services provided by two full time on-site Structural Engineers, two full time Site Safety Representatives, one full time Architect, one full time Mechanical Engineer and one full time Construction Manager Scheduler to assist the Senior Resident Engineer (SRE) team in monitoring and inspecting the construction activities for compliance with contract requirements and industry standards.

Lab Expansion Before
Before
Lab Expansion Before
After

VA Richmond Lab Expansion

Richmond, VA | 2016 - 2024

Provided construction documents and construction period services for the construction of 18,500 sf of new rooftop space for clinical lab and renovations of 3,500 sf for support and common space. Remodeled and reconfigured existing space and constructed new space to allow for an optimization of clinical service delivery, patient and family-caregiver privacy, collaboration between and among clinicians, educators and researchers, and efficiency of infrastructure.

VA 3 locations in NC Electrical Condition Assessments

Asheville, Salisbury & Fayetteville, NC | 2021 - 2022

AES has performed Electrical Condition Assessment studies of 3 VAMC’s. The purpose of these studies is to improve the safety and reliability of the electrical distribution system at the medical facilities. The scope of work for these projects included conducting electrical short circuit analysis, protective device coordination analysis, voltage drop analysis, arc flash hazard analysis, emergency power system analysis, and equipment condition assessments. Cost estimation for recommended changes is also included. The performed studies necessitate site surveys which include assessment and code compliance evaluation of the full electrical system.

Cherry Valley Event Venue

Franktown, CO | 2023 - 2024

AES provided design and specifications to remodel, expand and repurpose a large barn built at the turn of the century into a commercial wedding/event venue. This is a multi-disciplinary design incorporating architectural, mechanical, electrical, and structural engineering, as well as cost estimating.

Other Recent Projects

Sort by:  
Total Records Found: 51, showing 30 per page
TypeProject TitleCityStateYear CompletedProject Description
USACE Defense Logistic Agency Facility Condition Assessments NC, PA, TX, UT 2022 - 2023 Conducted the architectural, electrical and mechanical engineering portions of the FCA and PPD of each real property, such as quality control plan, reviews and conferences, Draft Report Package, Draft PPD Package, Final Report Package, Final PPD Work Package, FCA photos, confirmation notices and status reports.
USACE White Sands Missile Range B1407 White Sands NM 2019 - 2023 AES prepared 100% multi-discipline Design Documents for a $2.5 million CCL design-bid-build for 3,000 square foot special project tenant improvement. The renovation work included HAZMAT remediation, demolition, building renovations, site upgrades, and sustainable design.
USACE MUTE 4 and 6 Designs Worldwide, OCONUS 2021-22 As a sub, AES provided structural engineering and design for the Multi-Use Tall Envelope building for the USACE Center of Standardization. One option had an eave height of approximately 4 meters. The building has 5 bays along with expandable end walls. The other option had a 6 meter eave height.
NAVFAC Ford Island Bridge Repairs Pearl Harbor-Hickam HI 2022 - 2024 As a sub, AES conducted a detailed inspection of the existing conditions and deficiencies of the Ford Island Bridge, to provide an Engineering Report to address bridge and lighting deficiencies. We prepared a report to provide recommendations and estimated quantities for required cleaning, painting, repairs, replacement, and retrofits for deficient areas/members identified by the inspection.
National Parks NPS Camp Nelson Rehab Barracks Nicholasville KY 2023 - 2024 AES provided the preparation and completion of predesign, design development, construction documents and a site visit. Completed preliminary sizing calculations, prepared schematic drawings, and produced a three – five-page scoping report for all alternatives identified. This project included but is not limited to installing new cedar board (10") and batten (3") with a high-quality water repellant applied, as well as 10 new energy efficient windows to replace the failing windows currently installed.
National Parks NPS Mammoth Caves Rehab Frozen Niagra Shelter Mammoth Cave KY 2023 Provided Architect/Engineer professional services to renovate and upgrade the Frozen Niagara Shelter, which included, predesign, design development, construction drawings and cost estimates. Provided two concept designs for the shelter, which will accomadate seating capacity for up to 120 visitors. The existing shelter will be completely removed.
National Parks NPS Replace DDC Sub Control Modules at Acadian Sites Jean Lafitte National Park & Preserve LA 2022 - 2023 Provided Architect/Engineer services to replace the existing DDC sub control modules and thermostats within the Acadian Cultural Center, Wetlands Acadian Cultural Center, and Prairie Acadian Cultural Center buildings, which include predesign, design development and construction drawings.
National Parks NPS Jimmy Carter National Historic Park Addition Plains GA 2021 - 2023 AES designed new VIP (Visitors in Parks) RV Pads at the Jimmy Carter National Historical Park Boyhood Farm. Project will provide a master plan for the site and 4 RV pads with utility hookups similar to those found in commercial RV parks.
National Parks NPS Ft. Necessity FONE HVAC Title III Farmington PA 2023 - 2024 AES provided professional and consultation services to review primary construction contractors product submittals for compliance with project specifications and to answer any technical questions arising during the execution of the project.
National Parks NPS Replace HVAC Electrical at Edgar Allan Poe House Philadelphia PA 2023 - 2024 AES provided Architect/Engineer services, cost estimating, design development, construction documents, and site visits. The objective of this project is to replace failing HVAC and Electrical System, improve indoor air quality, and reduce required maintenance to maintain building equipment. The electrical and HVAC upgrade project increases outdoor air flow and address "Sick Building Syndrome" symptoms.
National Parks NPS OZARK Alley Spring Campground Upgrade Eminence MO 2024 - 2025 AES is providing multi-discipline design documents for the Integrated Park Improvement paln which will update campground layout, infrastructure, utilities, accessibility, concessions, flood resilience, comfort stations and natural resource protection. Project includes a charrette with stakeholders.
National Parks NPS Assateague Island National Seashore ASIS Berlin MD 2021-22 This project replaced all waterlines in the Maryland District of the park including approx. 10,065 LF of brittle, 2" flexible black plastic piping with steam mechanical fittings and clamps. Project also evaluated major water distribution system components to ensure system meets all requirements and included a pre-design analysis of the existing water distribution system so the waterlines are compatible with future use. Included considerations to extend a potable water supply line to a day use area to provide pressure needed for a fire suppression system and designing and routing the waterline corresponding to the Park's Flexible Design Strategy for Relocating Oceanside Campground Planning documentation.
National Cemetery Riverside National Cemetery Expansion Riverside CA 2022 - 2023 AES provided Structural, Mechanical/Plumbing, and Electrical/Telecom Engineering for this project for Master Planning and Development of a 35% design. Evaluate/expand electrical system, repurpose/renovate Adminisration Building, Honor Huard Facility, Education/Visitor Center. Modify/demolish and replace existing Committtal Shelter roofs. Construct Warehouse Facility, evaluate/design amphitheater for mainteneance and repairs. Construct satelltie public restrooms at West Gate entrance to cemetery.
National Cemetery Houston National Cemetery Construction Period Services Houston TX 2021 - 2024 As a sub, AES provided supervision and provided design services, construction period services and assistance during the construction solicitation phase.
National Cemetery Ft. McPherson National Cemetery Expansion Maxwell NE 2021 - 2024 As a sub, AES provided structural and electrical engineering for construction documents for development of 1500 in-ground cremains and a 150 marker memorial wall. The development will be constructed on a 17.8 acre parcel.
National Cemetery Natchez National Cemetery Burial Expansion Natchez MS 2022 - 2023 As a sub, AES provided electrical and structural engineering services for this gravesite expansion project, including furnishing all labor and materials to prepare design and construction drawings and specifications for all project elements and an estimate of construction cost. The intent is to construct a burial expansion consisting of 350 preplace crypt and 200 in-ground cremains burial plots including infrastrcture of utilities, signage, site furnishings, irrigation, exisiting road demolition, and a new committal service shelter to support the new development.
National Cemetery Baton Rouge National Cemetery Expansion Baton Rouge LA 2021 - 2024 As a sub, AES provided structural, electrical, and mechanical engineering services for demolition of a 1600 SF maintenance building/restroom and construction documents for a new 1600 SF maintenance building/restroom. This will include foundation, electrical, and HVAC/plumbing design and construction period services.
National Cemetery New Albany National Cemetery Expansion New Albany IN 2022 - 2024 As a sub, AES provided structural, mechanical/plumbing, and electrical engineering as the Designer of Record. AES provided structural engineering to support architecture for the maintenance/restroom building, columbarium, and rostrum work, mechanical/plumbing engineering for exhaust fans, ducts, and hot water supoly and mixing valve at eye wash and electrical engineering for smoke detectors, exterior security cameras, circuit breakers, and risk analysis for lightning protection. Includes construction period services.
National Cemetery Fort Lyon National Cemetery Upgrades Las Animas CO 2021 - 2022 As a sub, AES provided structural, electrical, and mechanical engineering services for demolition of a 1600 SF maintenance building/restroom and construction documents for a new 1600 SF maintenance building/restroom. This includes foundation, electrical, and HVAC/plumbing design.
National Cemetery Tallahassee National Cemetery MEP Tallahassee FL 2022 - 2024 As a sub, AES provided structural and electrical engineering for construction documents for development of 1600 pre-placed crypts (PC), and 2900 pre-placed concrete urn vaults (PV). Includes construction period services to expand the number of gravesites.
National Cemetery Albuquerque National Cemetery Phase 1 Albuquerque NM 2023 - 2024 As a sub, AES provided Mechanical, Electrical, Fire Protection and Security services to prepare for the design and contruction (design-bid-build) of Phase 1 of the New VA National Cemetery. This project provides for the Phase 1 Development at this new site by constructing 15 years of burial capacity. In addition, this expansion will incorporate 21st century design technology for efficiency and conservation. of natural resources.
Total Records Found: 51, showing 30 per page
Type VA Hospital
Project Title VA Mountain Home Replace UG Diesel Storage Tanks
City Mountain Home
State TN
Year Completed 2022 - 2023
Project Description As a sub, AES developed a complete construction document package ready for bidding to Removal of UST Site Design. AES provided civil portion of the work only, including a study to prepare conceptual documents. Documents included Sediment Control Plan for inclusion in Stormwater Pullution Prevention Plan (SWPPP), demolition plan, site plan (horizontal control), grading plan (vertical control) and technical specifications.
Type VA Hospital
Project Title VA Marion Bldg 50 Demo
City Marion
State IL
Year Completed 2021 - 2022
Project Description As a sub, AES provided civil engineering services including 135 LF of access road, attached head in parking, and associated intersections. The drawings included roadway plan and profile and coordination with the existing infrastructure.
Type VA Hospital
Project Title VA Fayetteville Bldg 4 Renovations
City Fayetteville
State NC
Year Completed 2020 - 2023
Project Description As a sub, AES provided structural engineering to renovate historical building 4 at the Fayetteville VAMC. This included showing hazardous materials and abatement, geotech, civil and landscape elevations and exterior details of landscaping and parking in relation to the surrounding conditions.
Type VA Hospital
Project Title VA Ft Wayne Replace Boilers (Civil) and Electrical
City Fort Wayne
State IN
Year Completed 2020 - 2025
Project Description As a sub, AES provided civil engineering for a 1940SF generator building addition with associated access road/drive, parking and utilities. Deliverables include site plan (horizontal control), grading (vertical control), drainage plans, utility plans, plan and profile of the new access road, and site demolition plans.
Type VA Hospital
Project Title VA Marion Upgrade Emergency Power
City Marion
State IL
Year Completed 2020 - 2022
Project Description As a sub, AES provided civil engineering design services to support regrading for a new pad-mounted generator and a new switchgear building, with a new gravel drive between the two new structures. Also prepared a site plan (horizontal control), grading plan (vertical control), site demolition plans, and GESC coordination.
Type VA Hospital
Project Title VA Tucson Site Prep Outpatient MRI
City Tucson
State AZ
Year Completed 2023 - 2025
Project Description AES provided Architect/Engineer services, site visits, cost estimation and design documents to prepare for the installation of a new Outpatient MRI in Building 81 including structural, electrical, HVAC, finishes, and all such systems and components as may be necessary to prepare for the installation of the new MRI Unit. Evaluated the existing structure in conjunction with the new equipment specifications in order to provide additional structural elements to support the weight of the new MRI in the location shown on the manufactureres installation drawings.
Type VA Hospital
Project Title VA Phoenix SPS Construction
City Phoenix
State AZ
Year Completed 2024 - 2025
Project Description AES submitted sealed drawings for Project 644-235 Expand Supply, Processing, Decontamination and Distribution at the end of 2019. Construction Period Services were de-obligated from our original contract. The project has recently been posted and it is out for bids for construction. AES will provide engineering support to answer Bidder inquiries and provide technical support to the VA. Construction Period Services will be added back to the contract after award.
Type VA Hospital
Project Title VA Cleveland Electrical System Study
City Cleveland
State OH
Year Completed 2022 - 2024
Project Description AES created a model of the site electrical system and conducted electrical fault, arc flash, load flow, and protection coordination studies using SKM Power Tools software. This work included site visits to VA campuses to asses the current electrical system, evaluation and analysis of energized equipment, collection of data, accuracy of labeling, final deficiencies report, and cost estimates. Peer reviews were conducted at 60%, 90% and final submissions.
Type VA Hospital
Project Title VA Tucson EHRM Training-Admin Space
City Tucson
State AZ
Year Completed 2022
Project Description AES provided A/E services for this design project; included site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to prepare a site and provide utilities.
Type VA Hospital
Project Title VA Phoenix Correct Toland Mizzel Power Study
City Phoenix
State AZ
Year Completed 2022 - 2024
Project Description AES reviewed the previous power study and FCA report to implement corrective actions and opportunities to improve power and electrical equipment. Conduct site visits, develop a mechanism to assess and evaluate risk and potential value for each proposed corrective action. Assess a parametric (rough) cost estimate for corrective actions and compile an overall list of corretive actions including risk, impact, value, and cost for corrective for each action.
Type VA Hospital
Project Title VA Tucson Replace Plumbing B2 and B38
City Tucson
State AZ
Year Completed 2023 - 2025
Project Description AES provided specifications for bidding, limited construction period services, drawings and a design to remove and replace all the existing plumbing, pipes and fittings in Building 2 and Building 38, this includes all domestic water, cold water, hot water, vent stacks, wet vets, and sanitary sewer lines. A site investigation/verification was performed to assess the current condition of B2 and B38’s plumbing and water main.
Type VA Hospital
Project Title VA New Mexico Combined CBOC EHRM
City Various locations (11 sites)
State NM
Year Completed 2021 - 2024
Project Description This project is to make upgrades to 11 telecommunications rooms at 11 Community Based Outpatient Clinics (CBOCs) throughout New Mexico to prepare for implementing the VHA EHRM system. AES is evaluating to assess compliance with requirements outlined in VHA Standards Alert, VA OIT, and CFM TIL standards. Existing telecom rooms, rack, UPS, existing switches, panels, existing CAT 6 cable, HVAC capacity, requirements for EHRM Equipment, existing fire detection and fire suppression, and existing door ratings for fire rating and hardware will be considered. Design will upgrade any of the above as required, including the addition of electrical circuits as needed. Includes construction period services.
Type VA Hospital
Project Title VISN 20 Facility Condition Assessments
City
State AK, ID, OR, WA
Year Completed 2023 - 2024
Project Description AES provided a field team made?up of the following disciplines: Architect, Electrical Engineer, Mechanical Engineer, Cost Estimator, Elevator Transport Specialist, Structural Engineer. The project consists of approximately 6.4M square feet. AES updated the existing CAI database, provide condition grades (A, B, C, D, F) for the items in the database.  For items grade as a D or F, the remaining life will be estimated.  We provided a cost estimate for replacement for items graded D or F.  We included a Top Ten list for each VA at the conclusion and will also assign a 1 through 5 risk level to all deficiencies graded D or F.
Type VA Hospital
Project Title VA Vancouver Community Living Center Ramp
City Vancouver
State WA
Year Completed 2023 - 2024
Project Description AES provided Architect/Engineer Services to develop detailed construction documentation for providing fire and life safety egress to the nursing home, building 1 CLC. This project required site investigation, design development, and construction specifications. The project provides new egress ramp and sidewalk at the end of each patient wing of Building 1 CLC, 4 exits. Each egress must accommodate a patient bed while nurse staff guide.
Type VA Hospital
Project Title VA Boise Remodel for 2nd CT
City Boise, ID
State ID
Year Completed 2023 - 2024
Project Description AES provided Architect/Engineer services to include design and construction period services, investigative services, planning consultations and visits, comprehensive design work, preparation of contract drawings and specifications, preparation of cost estimates, construction period services, site visits, reports, as-built drawings, and other design services necessary to complete the remodel of a CT scanning suite.
Type VA Hospital
Project Title VA Portland-Vancouver Correct HVAC
City Portland, OR
State OR
Year Completed 2023
Project Description AES provided A/E services to include site investigations, design development, construction specificiations and developed detailed construction documentation for providing alterations and finishes to Correct HVAC Deficiencies at the Portland and Vancouver Campuses. Project upgraded aging AHUs in building 1 & 11 in Vancouver, upgrade terminal units from pneumatic controls to direct digital control (DDC) and replace exhaust fans in Portland and Vancouver locations. The goal is to increase efficiency and prevent increased maintenance and downtime on existing units.
Type VA Hospital
Project Title VA Boise Expand Pharmacy 531-22-108
City Boise
State ID
Year Completed 2022 - 2024
Project Description Provided Architect/Engineer (A/E) professional services to include investigative services, planning consultations and site visits, design work, preparation of contract drawings and specifications, preparation of cost estimates, and constuction period services. Design shall include any site surveys and testing required providing a complete functionally sound design. This project will expand Inpatient Pharmacy from approximately 1825 SF to approximately 3600 SF.
Type VA Hospital
Project Title VA Spokane Renovate Rooms C208G-F for IR-RF
City Spokane, WA
State WA
Year Completed 2022 - 2024
Project Description Provided Architect/Engineer services to include preliminary concept and program development, investigative services, design narratives/analysis, planning consultations and visits, design work, calculations, preparation of contract drawings and specifications, sample boards, preparation of cost estimates, construction period services, site visits, and other services necessary to be modify and renovate to convert the room from an RF to an IR suite.
Type VA Hospital
Project Title VA Spokane AHU-01-04 Upgrade
City Spokane, WA
State WA
Year Completed 2021 - 2024
Project Description Provided construction documents to replace AHU-01 and AHU-04 located in Building 1 (Main Hospital). Project replaces the air handlers, electrical panel boards, breakers, cables and conduit for the AHUs. Variable flows are to be developed by utilizing VFDs and VAVs where applicable. DDC upgrades, exhaust fans, and other control systems are to be integrated with the existing BAS. Project replaces the ducts and trunks for supply and return that are currently undersized. Includes demolition and commissioning.
Type VA Hospital
Project Title VA Portland-Vancouver Correct FCA Deficiencies
City Vancouver/Portland
State OR
Year Completed 2019 - 2023
Project Description Provided site investigation and design development including drawings and other A/E Services. Created detailed plans to correct deficiencies found during the most recent facility condition assessment for both the Portland and Vancouver Campus. Designs provided corrections to doors, adding new fire alarms, phone lines, firmware for boiler, routing of new steam pipes, and telecom to sites.
Type VA Hospital
Project Title VA Seattle Replace Roofs
City Seattle
State WA
Year Completed 2019 - 2025
Project Description Provided all professional services required for the removal and replacement of approximately 177,000 square feet of roofing on the Seattle Campus of the VA Puget Sound Health Care System. Design replaced roof access hatches, expansion joints, and provides roof walkway systems for maintenance and operations personnel as required. Design ensured roofs and components met compliance with OSHA, NFPA, and IBC requirements.
Type VA Hospital
Project Title VA OK City Repair Exterior Building Envelope
City Oklahoma City
State OK
Year Completed 2024 - 2025
Project Description AES provided all A/E services for the investigation, design, cost estimating, preparation of construction documents, and construction administration services for the design to address the external deficiencies and defects of the Medical Center as well as specifying building construction materials that will provide reduced maintenance and an aesthetic that is consistent with the overall hospital design while maintaining conformance.
Type VA Hospital
Project Title VA OK City Replace Geotherm with Chiller
City Oklahoma City
State OK
Year Completed 2023 - 2024
Project Description AES provided Architect/Engineering services for the investigation, design, cost estimating, preparation of construction documents, and construction administration services to replace and upgrade the existing HVAC system.
Type VA Hospital
Project Title VA Miles City Arc Flash Study
City Miles City
State MT
Year Completed 2023 - 2024
Project Description Perform SKM electrical system studies at the VAMC campus, which includes site visits and evaluation of energized equipment, collection of data, final report and cost estimates.
Type VA Hospital
Project Title VA Ft Harrison Exterior Stairs
City Helena
State MT
Year Completed 2023 - 2024
Project Description AES provided Architect-Engineer services for Building 141 Exterior Stair Replacement.This renovation includes removal and replacement of the masonry brick stairs, cheek walls and caps, associated landings, hand railings, landscaping, the addition of a new canopy, new sconces, and tuckpointing. The work includes site investigations, design, and construction period services.
Type VA Hospital
Project Title VA Muskogee Upgrade B53 HVAC
City Muskogee
State OK
Year Completed 2023 - 2024
Project Description A/E services including development of all demolition, architectural, mechanical , and electrical drawings and specifications. Provided a detailed construction cost estimate and phasing plan for continued healthcare operations while construction is underway. The work includes site investigations, design and construction period services.
Type VA Hospital
Project Title VA Tucson Upgrade Plumbing B57
City Tucson
State AZ
Year Completed 2019 - 2024
Project Description Provided design to remove/replace all the existing plumbing, pipes and fittings in Building 57 (152K sf structure). Pipe work included domestic water, cold water, hot water, and sanitary sewer lines. AES prepared the schematic design through to construction documents. Includes construction period services.
Type VA Hospital
Project Title VA Lexington EHRM Training-Admin
City Lexington
State KY
Year Completed 2023 - 2024
Project Description As a sub, AES provided civil design, review cost estimates, construction period services, site visit and a complete construction document package to prepare the site and provide utilities to support modular trailer installation for the Electronic Health Record Modernization (EHRM) training and administrative support spaces.
Type VA Hospital
Project Title VA Prescott Renovate Historical Bldgs
City Prescott
State AZ
Year Completed 2018 - 2024
Project Description Provided renovation to office space for Buildings 19, 20 and 42, dated from approx 1905 and currently used as warehouses. Included asbestos abatement, electrical upgrades, and HVAC upgrades. Developed and provided a set of contract drawings, specifications, construction cost estimates and engineering calculations for bidding and construction. Includes construction period services.
Type USACE
Project Title B1374 & B1375 Medical Facilities Renovation
City JBSA Ft Sam Houston
State TX
Year Completed 2018 - 2022
Project Description Provided (2) 100% Design documents to fully renovate interior building finishes and systems, and for Life Safety compliance of Combat Medical Facilities buildings 1374 & 1375. Design included: Interiors, HVAC, Electrical/Lighting/Communication/Security Systems, Fire Alarm, Fire Protection, Plumbing and construction options to provide and install a passenger elevator in both buildings and to install high efficiency tinting film on exterior windows with direct solar exposure.